Diagram of the five steps after a code violation for peeling paint: the notice and its deadline, the hearing, the board's order, the daily fine, and the lien on the property

A code violation for peeling paint usually arrives as a city or county notice telling the owner of a commercial building to repaint by a set date. In Tampa, the notice gives no more than 21 calendar days, and missing the deadline can lead to daily fines and a lien on the property. We are Golden Brush Inc., a family-owned painting contractor in Tarpon Springs, and we paint commercial buildings across Hillsborough, Pasco and Pinellas counties.

This article gives general information about the codes. For legal advice, talk to a lawyer. Your notice names the code section and the deadline that apply to your property, and those are what count.

What the codes say about peeling paint

Each city and county writes its own property maintenance rules. The ones covering commercial buildings in our area say much the same thing: exterior surfaces must be kept painted or sealed, and peeling paint is a sign of poor maintenance.

  • City of Tampa. Chapter 19 applies to every commercial, business, institutional or industrial structure, no matter when it was built. Section 19-237 says "all store fronts and walls exposed to public view shall be kept in a good state of repair." It also says exterior surfaces must be "kept painted or sealed with an approved material where necessary for purposes of preservation and appearance," free of "excessive peeling paint."
  • City of St. Petersburg. Section 8-169 requires exterior walls to be made weather resistant with paint or similar materials. It says painted surfaces "shall not allow the outermost layer of paint to peel or deteriorate so as to expose underlying layers of paint to the weather."
  • Unincorporated Pinellas County. Chapter 22, Article V is a minimum standards code for commercial, business and industrial buildings. It requires storefronts and walls exposed to public view to be kept in good repair, and all exterior surfaces, "including fences, signs and storefronts," to be kept free of "excessive peeling paint."
  • City of Tarpon Springs. The city has adopted the International Property Maintenance Code. One chapter of the city code names the 2012 edition and another names the 2024 edition. The 2012 edition makes the owner responsible for the exterior and says: "Peeling, flaking and chipped paint shall be eliminated and surfaces repainted." It also requires rusted metal surfaces to be stabilized and coated.
  • Unincorporated Hillsborough County. The county describes its Property Maintenance Code as requiring "the exteriors of all residential, commercial and accessory structures be maintained to prevent decay and deterioration." For the exact wording, call the county at (813) 274-6600.

If your building is in another city, such as Clearwater, or in Pasco County, read the code section printed on your notice. Pinellas County's code enforcement office enforces county codes only in the unincorporated areas; inside a city limit, the city enforces its own code.

How long you have to fix a code violation for peeling paint

Florida's code enforcement law, chapter 162 of the Florida Statutes, requires the inspector to notify the violator and give "a reasonable time to correct the violation." Local codes then set their own limits:

Bar chart of the time local codes give to fix peeling paint on a commercial building: up to 21 days in Tampa and up to 120 days in unincorporated Pinellas County, with a reasonable time in St. Petersburg and Tarpon Springs

  • Tampa: no more than 21 calendar days.
  • St. Petersburg: "reasonable time" means what a prudent person acting diligently would need, considering the scope of the work, any permits required, and expected delays such as weather.
  • Unincorporated Pinellas County: up to 120 days.
  • Tarpon Springs: under the 2012 edition of the property maintenance code, a reasonable time, with notice of your right to appeal.

Three weeks is not long to get bids, choose a contractor, schedule a crew and repaint a commercial exterior. If you need more time, ask before the deadline. Tampa's code says a violator with a hardship "should notify the code enforcement officer of the hardship within the time period provided to correct the violation(s)." The officer may extend the time if the city finds the hardship valid. Tampa also lets a violator file a written motion asking the board or special magistrate to modify the compliance deadline.

In Tarpon Springs, commercial painting is not on the building department's list of permit-exempt work, so check with the building department before you count your days.

Make sure the notice reaches you, too. Under state law, a notice can be sent by certified mail to the tax-roll address or to a corporation's registered agent. It can also be left with the manager of commercial premises. If the local government tries to mail or deliver it and also publishes or posts it, the notice counts even if you never received it. Ask tenants and on-site managers to pass any code notice along the same day.

What happens if the deadline passes

If the violation remains when the correction period ends, the inspector asks the code enforcement board or special magistrate for a hearing. Under state law, the case can still go before the board even if you fix the problem after the deadline.

The board can order you to comply by a specific date and warn that a fine may follow. Miss that date and the fine runs for each day the violation continues. State law caps fines at $250 a day for a first violation and $500 a day for a repeat, but a county or city of 50,000 or more may raise those limits by ordinance. Tampa has: its cap is $1,000 per day per violation for a first violation and $5,000 per day for a repeat. St. Petersburg's code uses $250 and $500.

From there:

  • The fine becomes a lien. A recorded fine order is a lien on the land and on other property the violator owns, and the fine keeps accruing until the building complies.
  • The lien can be foreclosed. Once a lien has gone unpaid for three months, the board may authorize the local government's attorney to foreclose or sue for a money judgment. The statute exempts only homestead property from foreclosure.
  • It follows the property. A recorded order binds later buyers. If you sell during a pending case, you must disclose it in writing, and the new owner becomes responsible for compliance.
  • Repeat violations move faster. The inspector does not have to give you time to correct a repeat violation before requesting a hearing.

Work done to fix the problem still counts. In setting a fine, the board must consider "any actions taken by the violator to correct the violation," and it may reduce a fine. St. Petersburg's board may also defer a fine for a reasonable time while the work is completed. An appeal of a final order to circuit court must be filed within 30 days.

How to get the repaint done in time

  1. Read the notice closely. Note the code section, the exact deadline and the inspector's contact details.
  2. Call a commercial painter the same week. On a 21-day deadline, you need time to get bids, sign a contract and schedule the crew.
  3. Plan for surface preparation. The codes ask for surfaces that stay painted and weather resistant. In our commercial process, surface preparation and the protection of furnishings and equipment come before the paint goes on, and we use commercial-grade paints.
  4. Talk to the officer early. If the work cannot be finished by the deadline, contact the officer before it passes.
  5. Keep a record. The board must consider what you did to correct the violation, so keep your contract, invoices and dated photos of the finished work.

We paint storefronts and facades, offices, retail stores and shopping centers, and industrial buildings and warehouses, with weekend and after-hours service available to keep disruption to your tenants and customers to a minimum. Golden Brush Inc. has been a Florida corporation since 1998, holds an A+ rating with the Better Business Bureau, and is insured and bonded, with full commercial liability insurance and worker's compensation coverage.

Book a walk-through and a free estimate

If you have a code notice for peeling paint, or can see the paint starting to go and want to deal with it before an inspector does, call us at 727-937-5998 or request an estimate at https://goldenbrushpaint.com/estimate/. We will walk the building with you, talk through your deadline, and give you a free, detailed estimate for the repaint. No deposit is required, and we respond to estimate requests within one business day.